Rank: Member
Groups: Registered
Joined: 12/14/2010(UTC) Posts: 4
|
Have read on how to check switches. My push start switch reads 2 ohms which tells me that it is good. I want to check my other switches but not sure were to put the leads. Checking the timer switch there are 15 wires. Need help on were to place leads and what ohms should show. If I understand it right if the meters reads all the way to the left the switch is bad ( side ways eight ) Kelly
|
|
|
|
Rank: Advanced Member
Groups: Senior Expert
Joined: 8/16/2007(UTC) Posts: 3,273
|
Maybe you can tell us what your machine is (or isn't) doing, that prompts you to check the timer.
|
|
|
|
Rank: Member
Groups: Registered
Joined: 12/14/2010(UTC) Posts: 4
|
dryer does not run checked plug and breaker at box all okay then checked push start switch and read 2 ohms Kelly
|
|
|
|
Rank: Member
Groups: Registered
Joined: 12/14/2010(UTC) Posts: 4
|
Originally Posted by: magician59  Maybe you can tell us what your machine is (or isn't) doing, that prompts you to check the timer. dryer did not work checked plug and breaker at box all okay. Then checked push start switch had 2 ohms. Was going to check oyher switches what do you suggest Kelly
|
|
|
|
Forum Jump
You can post new topics in this forum.
You can reply to topics in this forum.
You can delete your posts in this forum.
You can edit your posts in this forum.
You cannot create polls in this forum.
You can vote in polls in this forum.
Important Information:
The AppliancePartsPros.com uses cookies. By continuing to browse this site, you are agreeing to our use of cookies.
More Details
Close